Building or using a crane near Hall-miller Muni (ATA)?

Hall-miller Muni in Atlanta, Texas is a public-use airport. Under 14 CFR 77.9, anything within 20,000 feet of its runways that rises above a 100:1 slope needs FAA Form 7460-1 at least 45 days before construction. Check your exact site free.

No address handy? Try 16700 Saticoy St, Van Nuys, CA 91406

How tall can you build near ATA without filing?

The notice surface rises 1 foot for every 100 feet of horizontal distance from the nearest point of the nearest runway, starting at the runway's elevation. Using the lowest runway-end elevation, 261 ft above sea level:

Distance from nearest runwayNotice required above (height over 261 ft)…which is this elevation (AMSL)
250 ft2 ft264 ft
500 ft5 ft266 ft
1,000 ft10 ft271 ft
2,000 ft20 ft281 ft
3,000 ft30 ft291 ft
5,000 ft50 ft311 ft
7,500 ft75 ft336 ft
10,000 ft100 ft361 ft
15,000 ft150 ft411 ft
20,000 ft200 ft461 ft
Beyond 20,000 ftOnly the 200-ft-above-ground rule applies (77.9(a))

If your ground is lower than 261 ft you can build taller by the difference; if it's higher, less. Cranes count at their maximum height. The free check above uses USGS ground elevation for your exact spot.

Runways and notice boundary

5,000 ftN

Dashed line: the 20,000-ft area where the 100:1 notice slope applies; inner line: 5,000 ft.

RunwayLengthEnd elevations (ft AMSL)
05/233,800 ft280.3 / 268.2
15/332,264 ft273.2 / 261.4

Filing Form 7460-1 near ATA

More: Do I need to file Form 7460-1? · Cranes and Form 7460-1

Other public-use airports nearby

Source: FAA airport, runway and runway-end data (NASR cycle effective 2026/10/01). Screening only — the FAA issues determinations.