FAA 7460-1 › Georgia ›
Building or using a crane near Fort Mcpherson (GA96)?
Fort Mcpherson in Fort Mcpherson, Georgia is a public-use heliport. Under 14 CFR 77.9, anything within 5,000 feet of it that rises above a 25:1 slope needs FAA Form 7460-1 at least 45 days before construction. Check your exact site free.
No address handy? Try 16700 Saticoy St, Van Nuys, CA 91406
How tall can you build near GA96 without filing?
The notice surface rises 1 foot for every 25 feet of horizontal distance from the nearest point of the heliport, starting at the heliport's elevation. Using the lowest facility elevation, 1,052 ft above sea level:
| Distance from heliport | Notice required above (height over 1,052 ft) | …which is this elevation (AMSL) |
|---|---|---|
| 250 ft | 10 ft | 1,062 ft |
| 500 ft | 20 ft | 1,072 ft |
| 1,000 ft | 40 ft | 1,092 ft |
| 2,000 ft | 80 ft | 1,132 ft |
| 3,000 ft | 120 ft | 1,172 ft |
| 5,000 ft | 200 ft | 1,252 ft |
| Beyond 5,000 ft | Only the 200-ft-above-ground rule applies (77.9(a)) | |
If your ground is lower than 1,052 ft you can build taller by the difference; if it's higher, less. Cranes count at their maximum height. The free check above uses USGS ground elevation for your exact spot.
Heliport location and notice boundary
Dashed line: the 5,000-ft area where the 25:1 notice slope applies.
Filing Form 7460-1 near GA96
- File online through the FAA's OE/AAA system at least 45 days before construction or before applying for a building permit, whichever is first. Filing is free.
- You need NAD 83 coordinates, site ground elevation, structure height above ground and above sea level.
- Construction on airport property always needs notice, whatever the height.
More: Do I need to file Form 7460-1? · Cranes and Form 7460-1
Other public-use airports nearby
- ATL — Hartsfield/jackson Atlanta Intl (5 nm)
- FTY — Fulton County Exec/charlie Brown Fld (6 nm)
- PDK — Dekalb-peachtree (12 nm)
- MGE — Dobbins Arb (13 nm)
- RYY — Cobb County Intl/mccollum Fld (20 nm)
- HMP — Atlanta Speedway (20 nm)
Source: FAA airport, runway and runway-end data (NASR cycle effective 2026/10/01). Screening only — the FAA issues determinations.